Add your promotional text...

Delhi Urban Extension Road 2 (UER 2) Overview

Discover the Delhi Urban Extension Road 2 (UER 2), a vital 74.98 km expressway under construction that enhances connectivity across Delhi's western boundary. Linking major highways and key areas, t...

1/27/20252 min read

Delhi Urban Extension Road 2 (UER 2) - Overview and Status

The Delhi Urban Extension Road 2 (UER 2) is a significant under-construction expressway (NH-344M) being developed by the National Highway Authority of India (NHAI). It will serve as the third semi-ring road within Delhi along its western boundary, enhancing connectivity across the region.

Key Highlights of UER 2

  • Total Project Length: 74.98 km

  • Phase 1 Length: 38.111 km

  • Spur Lengths:

    • Bahadurgarh Spur: 7.269 km

    • Sonipat Spur: 29.60 km

  • Lanes: 6-lane main expressway & 4-lane spurs

  • Completion Deadline: December 2024

  • Estimated Cost: ₹7,715.60 crore

  • Right of Way (ROW): 100 meters

  • Owner: National Highway Authority of India (NHAI)

  • Status: Under Construction

Project Features and Route

  • Phase 1 Route:
    Starts from NH-1 near Bankoli village and ends near Sector 24 in Dwarka.
    It connects NH-1, NH-10, NH-8, and NH-2 via key regions including Bawana Industrial Area, Rohini, Mundka, Najafgarh, and Dwarka.

  • Purpose:
    Provides seamless access between north and northwest Delhi, IGI Airport, and Gurgaon.

  • Engineering Model: EPC (Engineering, Procurement, and Construction).

Historical Background

  • Originally envisioned by Delhi Development Authority (DDA) under the Delhi Master Plan 2021, the project faced delays due to land acquisition and financial issues.

  • Handed over to NHAI in 2018, the project received ₹4,000 crore of viability gap funding from DDA.

Current Status

  • Expected Completion: December 2024.

  • Land Acquisition: Minor acquisitions underway.

  • Under Construction: 7.5 km stretch as part of Dwarka Expressway packages.

Tenders and Contractors

The project is divided into 5 packages:

Package Length Contractor Status Package 1 15.70 km HG Infra Engineering Under Construction Package 2 13.45 km Ceigall India – Krishna Constructions JV Under Construction Package 3 9.661 km Gawar Constructions Ltd. – ES Infra JV Under Construction Package 4 (Sonipat Spur) 29.60 km Ram Kumar Contractor Lowest Bidder, Work Assigned Package 5 (Bahadurgarh Spur) 7.269 km SS Builders – Diamond Construction JV Lowest Bidder, Work Assigned

Phase 2 of UER 2

The Delhi Government will take up Phase 2, which includes:

  • Rangpuri Bypass to Vasant Kunj.

  • Upgrades to Nelson Mandela Marg and Mehrauli-Badarpur Road.

  • Elevated corridors and interchanges at critical points.

Benefits of UER 2

  1. Improved Connectivity: Seamless access across Delhi, Gurugram, and IGI Airport.

  2. Decongestion: Reduces traffic pressure on NH-8 and other arterial roads.

  3. Economic Boost: Facilitates trade and movement in Delhi NCR.

  4. Environmental Advantage: Landscaping and greenery along the route for eco-friendliness.

Conclusion

The Delhi Urban Extension Road 2 (UER 2) is set to revolutionize connectivity across Delhi and neighboring regions. With its strategic route and integration with key highways, UER 2 will play a pivotal role in shaping the region's infrastructure and boosting economic growth. Stay tuned for updates as the project progresses toward its December 2024 completion!